Town of Norwood

Home Departments Public Works
Public Works Department PDF Print E-mail
Article Index
Public Works Department
Snow and Ice Policy
Winter Street Composting Facility
Bulk Item Disposal Policy
Hydrant Flushing and Testing
Cross Connection Control Program
Leaf and Brush Pick-Up
Announcements
Water Conservation Kits
Postings/Documents
All Pages


Hours of Operation:
Monday - Friday 7:00 a.m. - 3:30 p.m.

781-762-1413

This e-mail address is being protected from spambots. You need JavaScript enabled to view it , Director of Public Works/Town Engineer

This e-mail address is being protected from spambots. You need JavaScript enabled to view it , Assistant Superintendent of Public Works

This e-mail address is being protected from spambots. You need JavaScript enabled to view it , General Foreman - Water/Sewer/Drain

Michael Driscoll, General Foreman - Highway/Parks

Sara Winthrop, Administration Manager

 

HOUSEHOLD HAZARDOUS WASTE DAY

Winter Street Composting Facility - 370 Winter Street 

Saturday, September 24th - 8:00 am - 11:00 am

Facility closes at 11:00 am

LEAF or BRUSH DISPOSAL IS NOT ALLOWED. 

 

 

SIDEWALK RESURFACING

The town has contracted with Lorusso Corp. to resurface various asphalt sidewalks. The project will resurface approximately 7 miles of the towns 140 miles of sidewalks. Public Works will be trying to evenly distribute the work throughout the town. After the asphalt is installed, any excessive low areas in the grass strip will be filled in with loam and seed. We ask the homeowners to water these areas to help germination. The contractor will also be returning to make miscellaneous repairs.We appreciate your patience.

Below are the known construction areas for the week of September 19 - September 23. Please expect detours and delays.

Nichols St - Berwick Place Rotary (Gas Company) DETOURS NOT EXPECTED

Guild St - Broadway to Lenox St (MBTA Bridge) GUILD ST BLOCKED BETWEEN LENOX ST AND BROADWAY (8 am - 3 pm)

Vernon St - Nichols Street to Beech St (Gas Company) DETOURS IN PLACE - RESIDENTS ONLY

Cottage St - Prospect St to Nichols St (Gas Company) DETOURS IN PLACE - RESIDENTS ONLY.

Prospect Ave - entire street (Roadway construction) DETOURS IN PLACE - RESIDENTS ONLY
PP

St. John Ave - entire street -  (Gas Company) NO THRU TRAFFIC - RESIDENTS ONLY

Folan Ave. - entire street - (Gas Company) NO THRU TRAFFIC - RESIDENTS ONLY 

Nichols Street @ Vernon Street (Water main cleaning and lining) NO THRU TRAFFIC 

Winter St. @ Nichols St (Water main cleaning and lining - Wednesday -thru Friday) NO THRU TRAFFIC - DETOURS IN PLACE

Dean Street - Pond St to Jacobson Dr - (Drain Work) ROAD CLOSED TO THRU TRAFFIC - EMERGENCY VEHICLES and BUSES ALLOWED

Phillips Ave - Walpole St to Winslow Ave - (Sewer work) ROAD CLOSED TO THRU TRAFFIC - RESIDENTS ONLY

Washington St - Guild St to Hoyle St - (Crosswalk installation) ROAD OPEN TO 2 WAY TRAFFIC - MINOR DELAYS POSSIBLE 

 

 

 

Follow us on Twitter.

The Norwood Department of Public Works is responsible for the operation and maintenance of the Town's infrastructure in the of streets, sidewalks, sanitary sewers, storm drains, public shade trees, miscellaneous town owned buildings and land, various component town's motor fleet. DPW is also responsible for Highland Cemetery.

Follow us on Twitter.

Click the link below to nominate a Recycler of the Month:
https://www.surveymonkey.com/s/FHRKBDB


 



Last Updated on Thursday, 22 September 2016 10:55
 

Our Town

Latest Events

Wed, Sep 28th, 2016, @7:00pm - 08:00pm
School Committee Meeting
Wed, Sep 28th, 2016, @7:00pm - 08:00pm
9/28/16 MEETING CANCELLED -School Committee Meeting
Thu, Sep 29th, 2016, @7:30pm - 08:30pm
Permanent Building Construction Committee Meeting
Mon, Oct 3rd, 2016, @7:00pm - 08:00pm
Planning Board Meeting
Tue, Oct 4th, 2016, @7:00pm - 08:00pm
Zoning Board of Appeals Meeting

Weather

Joomla Templates by JoomlaShack